How to install therecovery pump with its ink splitter and solenoid valve and tubes for Videojet 1000 series inkjet printer?

This is the recovery pump:

Let’s assemble the accessories for the recovery pump first:

Let’s put it on top of the recycling pump and install the screws:

We installed the ink diversion block:

Then we install the screws on the side of it:

We install the solenoid valve on the recovery pump in this position:

The recycling pump is installed:

Then we install it in the machine, Let’s put it here and install the two screws:

We are going to connect four tubes to the four interfaces of the recovery pump:

Let’s install the recycling tube first:

Then we install this blue cleaning tube and this orange tube:

Let’s just install the exhaust pipe here:

Pipes installation complete:

Then the installation of the pipe and the recovery pump is complete:

Ask For A Quick Quote

We will contact you within 1 working day, please pay attention to the email with the suffix “sales@cheef.cn”